2015 Potato House
In spring of 2015 ground work was begun for a 21,730 square foot, ICF potato house.With the footings poured and the forms stripped off, they were ready for walls. Using 8 inch core blocks we started building the walls, carefully following the engineers specs.
Almost ready to pump concrete.
Once the walls were completed, trusses were swung into place with a crane, and roof metal was installed.With ceiling and wall metal finished the attic was ready for insulation. We blew in cellulose for an R value of 60.
We hope the farmer will be proud of their building and we believe it will provide them with many years of use.